44 out of 49 SEEDs Matched with Mentors

We only have five more SEED Engineering mentoring participants
to match in the 15 January – 15 June 2007 Established Staff
term. So far:

  • 24 November 2006 – applications were due
  • 28 November – 49 participants were selected
  • 11 December – first 49 invitations to mentors out in email
  • 14 December – 15 matched (31%)
  • 18 December – 26 matched (53%)
  • 25 December – 37 matched (76%)
  • 1 January – 37 matched (76%)
  • 8 January – 44 matched (90%)

I just announced the SEED-2 term as well. This is an experimental term (pilot) to see how it would benefit SEED participants who entered the program some time ago to be matched with a subsequent official SEED mentor. SEED-2 will run March – September 2007. We already have two applications in, all materials are due by 19 January 2007.

Leave a comment

Filed under Mentoring & Other Business

Vocal Conservatory Auditions

We are still finishing up and following up on all nine of Jessica’s
college applications. My daughter gave her first vocal conservatory
audition this morning at 9 a.m. in San Francisco. We started driving
at 7:15 a.m. She was singing two songs for evaluation by Oberlin Conservatory:

  • La lontananza (Gaetano Donizetti,1797-1848) in Italian
  • American Lullaby (Gladys Rich) in English

We arrived about 20 minutes early with Simona (piano
accompanist), Jessica’s resume with an 8×10″ glossy black and white
photo, and the music binder. The amount of arranging it took to
get the accompanist, the photo, and the girl to the audition
on time was tiring even though the audition itself only took half an
hour. We now have Jessica’s audition photo on-line so
we can print as many as we want. We will hear in March whether Oberlin is
interested in taking Jessica as one of their 15 vocal music students
for next year.

Carnegie Mellon school of music has already listened to Jessica’s
audition CD and declined to hear her in person. Since the audition is
80% of the acceptance decision, this means that CMU music will not take
her. She was disappointed
but still hopes to get into CMU as a regular student even if she cannot
be a conservatory student there. In two weeks, we fly to Houston, TX to
audition for the Shepherd School at Rice Univ. Next month,
Jessica sings for Lawrence (in San Francisco). Simona will
play piano again.

We have mailed out all of the audio CDs to the other schools
(Princeton, MIT, Brown, Smith, and Univ. Rochester). Jessica is
working out the remaining in-person interview dates and also
checking with each school to be sure they received everything
they need. She has already re-sent some materials to Rice.

Jessica sent her Advance Placement test scores out last month. However,
when she got the confirmation letter from the College Board, she
found they had sent a set of scores to the Massachusetts Maritime
Academy instead of to MIT. She called the College Board and got
them to send in the scores to MIT. The next day, Jessica got an
application packet from the Massachusetts Maritime Academy. I guess
they liked the scores even though they were sent in error!

On top of all of this, Jessica has first semester final exams next
week. She already turned in her final project for the Great Novels
class. She composed and then recorded a CD of four songs from Toni
Morrison’s Song of Solomon (one of the Great Novels they read).
It’s a great deal of work to be a High School Senior.

Leave a comment

Filed under Home & Family

Tree Trimming and Caboose Move Variance Permit

There is a crew from DaveyTree
out in our yard now pruning 11 trees. We needed to get all of them
smaller and lower to be able to lift in the caboose over. As requested
by the San Jose water department, we are dumping all of the tree trimmings
down our bank of the Guadalupe River (below the top and above the water).
The tree crew was prepared to chip and haul it all away but we need all of
that brush to build up our bank and protect it from erosion. This will be
an upsetting day for the feral cats on the river bank and some squirrels
whose tree top homes are being relocated.

We have another appointment next week to have San Jose city planning review
our Variance Permit application to move WP668 into our yard. At their
request, we have reworked the Special Use Permit application they originally requested. Last month, John rewrote and reprinted the 350 square feet
of application forms and backup paper with the latest requested changes.
I just hope they accept this version of the permit application. I would like
to get the caboose moved, hopefully before
the first anniversary of its arrival in San Jose (28 February 2006).

In the time it has been in storage, the caboose has dried out, we have
filled in our swimming pool and replaced it with a short rail line,
the caboose body has been roofed and electrified, we moved in the wheels onto
the tracks, and we stripped 2/3 of the old paint on the caboose body. At
the request of the place where it is stored (new management – new broom sweep),
we have stopped all work. We want to bring WP668 home soon.

Here are selected pictures from the caboose move and the work since:


WP668 Leaving San Francisco’s Hunter’s Point:

Leaving Hunter's Point, 28 Feb 2006, photo: copyright 2006 Katy Dickinson

Caboose in San Francisco traffic:

Caboose in San Francisco traffic, 28 Feb 2006, photo: copyright 2006 Katy Dickinson

Crossing tracks:

Crossing Tracks, 28 Feb 2006, photo: copyright 2006 Katy Dickinson

Heading south on highway 101:

Heading south on highway 101, 28 Feb 2006, photo: copyright 2006 Katy Dickinson

Under the lowest bridge (14 feet, 10 inches):

Under the lowest bridge, 28 Feb 2006, photo: copyright 2006 Katy Dickinson

Home in San Jose (2/06):

Home in San Jose, 28 Feb 2006, photo: copyright 2006 Katy Dickinson

New Yard Track (4/06):

New Yard Track, April 2006, photo: copyright 2006 Katy Dickinson

Backyard with Wheels (8/06):

Backyard with Caboose Wheels, August 2006, photo: copyright 2006 Katy Dickinson

Fiat Lux (8/06):

Fiat Lux, August 2006, photo: copyright 2006 Katy Dickinson

New Roof (10/06):

New Roof, October 2006, photo: copyright 2006 Katy Dickinson

Ready for Winter (10/06):

Ready for Winter, October 2006, photo: copyright 2006 Katy Dickinson

Images by Katy Dickinson (Copyright 2006)

Leave a comment

Filed under Caboose Project and Other Trains

New Water Heater and Energy Options

John and I decided to get our family a new water heater for Christmas.
We started this project months ago, researching options in terms of
energy use, price, and longevity. Our old water heater was still going
after 12 years of service but it mostly produced either scalding or cold
water and the last one to take a morning shower had a choice between tepid
or cold water (or sometimes just cold or colder). The main problem is that
the water in our San Jose area is very hard (full of minerals), so the
calcium builds up in the water tank, lines, and in crusty deposits on the
shower and faucet heads.

Our first plan was to get a tankless water heater. We researched this
and particularly liked the energy savings. However, it took us months
to find a plumbing company in our area which could supply and install
a tankless water heater system. When we finally did and the plumber
eventually came out to look at the old water heater in our basement, it
turned out that the equipment and labor
would cost about $4,000. Worse, even though tankless systems have
been in use elsewhere for a long time, they are just recently approved
for use in our area so there is less than 2 years of history of how they
work with our kind of water and home plumbing. We regretfully decided not to
install a very expensive “1.0” system.

Our next choice was an energy efficient tank water heater. John
again researched the options and called the plumber back to talk. Again,
it turned out that the hard water made our choice. We looked into
getting a water softening system but even though this would double the
efficency, it also doubled the cost. At the end of all of our research
and discussion, it seemed that any new tank replacement would provide improved
energy efficiency if we drained it once a year to get rid of the calcium
build up
. So, we might as well get the biggest model that would fit in the
space. The equipment and labor ended up costing $1,575.

Yesterday, our new 75 gallon hot water heater arrived and after much noise,
and carrying of bits and pieces up and down the basement stairs, was
installed. The old 40 gallon tank from 1994 went away on the same truck.
The water flow in
our house has increased dramatically and we are still getting bits of rust
and grit every time we turn a spigot. Apparently, because the new water heater
isn’t full of calcium, it is pushing more water through the pipes and
cleaning them out. We had a choice of temperature settings A, B, or C. (Reading
the manual would probably help but we are not desperate yet.) We
started off at setting B but that produced scalding tap water, so we
lowered the temperature setting.

I must admit as a native Californian I feel more secure having 75 gallons of
water in our house in case of earthquake or other emergency. John is from
the Midwest and feels more comfortable with the tankless option.

It is frustrating to do all sorts of research only to find that our energy
conservation choices are limited by the hard water in our very local
environment. However, we figure by the time we are ready to replace the
tank we just installed, tankless water heaters will have some history and
we can look at that option again.

Leave a comment

Filed under Home & Family

39 out of 49 SEEDs matched

We started the mentor matching cycle on 11 December and as of today,
39 out of 49 participants are matched:

  • 24 Nov 2006 – Application period ended
  • 28 Nov – 49 SEED Participants Selected
  • 11 December – first 49 invitations to mentors out in email
  • 14 December – 15 matched (31%)
  • 18 December – 26 matched (53%)
  • 25 December – 37 matched (76%)
  • 1 January 2007 – 37 matched (76%)

Nothing much happened during Sun’s winter break week but two potential
mentors whom I contacted before Christmas agreed to accept a match today.
Quite a few of the other potential mentors are still out on vacation but
I hope to hear from more this week.

So far, we have 10 Vice Presidents or Fellows and 18 Directors or Distinguished
Engineers matched this term. Most of the mentors are in California (from
San Diego to San Francisco) but there are some based in other states (4 in Colorado,
1 in Massachusetts, 1 in Illinois, and 1 in New Mexico) and countries
(1 in the UK, 1 in Germany, 1 in France, and 3 in China). They represent
a wide diversity professional areas: Software, Systems,
Service, Marketing, Finance, Labs, Business Planning, Sales, etc.

The SEED Engineering mentoring program has 3 priorities:

  • Increase the value, satisfaction, and retention of program Participants and their Mentors.
  • Build Sun’s Engineering community by making and strengthening connections between its members and with the rest of Sun.
  • Work to balance the diversity of Participants in terms of demographics, professional area, and geographic location.

This term is looking very strong so far in building connections between
professional areas and in having a good diverse balance. In about three months,
we will send out our first quarterly survey to this group and see what they
say about their satisfaction. Next summer, after Sun’s annual focal
reviews are complete, we will see how everyone is doing in the more objective
measures of performance, promotion, and retention. Until then, Tanya Jankot
and I will do our best to support this term’s participants and mentors
and to help them make this a great learning experience.

Leave a comment

Filed under Mentoring & Other Business

Reading Christmas Books

We went to Christmas Eve church service with our daughter Jessica’s
boyfriend’s family. The modern Christian service featured a large rock
band, words to the Christmas carols projected onto big screens
flanking the podium, a pastor ventriloquist with a puppet giving the
sermon, and lighted candles for the congregation to hold up at the end.
It was very different from the traditional Episcopal service (with
processions, classical music and incense) with which we usually celebrate.

The next morning, our family had a lovely Christmas morning opening
presents in front of the fireplace. Jessica made waffles for
breakfast. We then cooked and hosted dinner
for 12 (plus 3 visitors after) that night. I set out all of the
china in the kitchen for John to plate then Jessica and Paul served
the courses to the table. It was fun to try that instead of everyone
serving themselves from big platters and bowls. By serving courses,
nothing gets stuck (unpassed and uneaten) at the end of the long
table or on the sideboard. I enjoyed being able to use lots of china,
crystal, and silver. We are still working our way through the leftover
food.

Jessica’s big present was an Apple MacBook Pro with Intel dual processor. This computer was both a Christmas and birthday present. She has
transferred everything from her old Apple PowerBook (which she said
was very easy to do) and has been working on it happily ever since.
John and I wanted to give her the new laptop during her last semester
in High School so she was used to it before going to college. Jessica
is also reading Terrier, the new Tamora Pierce book in her Tortall
series.

Paul has been dividing his time between his three new movie
DVDs (The Tuxedo, X-Man Trilogy, and Pirates of the
Caribbean – Dead Man’s Chest
), and reading Eldest, the sequel
to Paolini’s Eragon. We go to see the Eragon movie
tonight since I finished reading it yesterday. The book was long
(needed editing!) and felt like a mishmash of four or five other
sword-and-sorcery life journey novels. Some parts were just silly
(metal armor for a dragon) but it is still an impressive first novel.
I have also been looking through our other new books: The
Complete Guide to Growing Cacti & Succulents – A Comprehensive Guide
to Identification, Care and Cultivation
and The Railroad Caboose.

There has been a rain and windstorm the last few days. Plastic buckets
and palm fronds were flying around the neighborhood all yesterday afternoon. Today is cool and clear, good gardening weather.

Leave a comment

Filed under Home & Family

Last 2 Fruitcakes in Oven

After decorating the Christmas tree, our family held its annual fruitcake assembly and baking party last night. My son Paul mixed pounds and pounds of dates and nuts and candied fruit in a big new gardening bucket I bought for the purpose. After much discussion, raisins and apricots were left out but dried figs were added. We have used the same recipe (from Mrs. Benziger of Knoxville, Tennessee) all of my life but the particular mix each year varies by the taste of the cooks. Everyone wore a tea cosy or Santa hat for the event.

My daughter Jessica and mother chopped and measured and mixed and discussed modifications. We baked one of the cakes in a rose-shaped Bundt pan this year. The tips of the petals are dry but otherwise it worked well. My daughter is brushing honey on the top now to moisten it. There is one big round fruitcake but the other 6 are loaf shaped. The last 2 loaves are in the oven now. They take over an hour to bake and no one wanted to stay up past midnight for two more to cook.

Today we visit the Dickens’ Christmas Fair at the Cow Palace in San Francisco. Jessica has assembled a costume of sort-of Victorian clothes since she likes to dress up. My mother is looking forward to sitting down with mulled wine and listening to sea chanties and bawdy songs in Mad Sal’s Alehouse. I plan to spend some of my fair time shopping and some listening to the songs or maybe watching a play by Gilbert and Sullivan.

Leave a comment

Filed under Home & Family