Today has been a busy day for WP668, our backyard caboose. After much preparation,
the metal roof was installed (by
Wildcat Metals) and the subfloor went in (by
Armstrong Carpet & Linoleum).
Tomorrow, the linoleum floor covering goes down. This is also a school day
Paul, plus Jessica’s first in-person work day at Stanford University Library
(she has been programming for them part-time from Carnegie Mellon in Pittsburgh,
PA). So, I drove the kids and worked in Menlo Park and John stayed home to work
in San Jose and keep and eye on the two work crews in the backyard. The
photos below show the progression of roof and floor development since
January 2006 when we bought WP668.
|
Original Roof-January 2006 San Francisco-Golden Gate Railroad Museum
|
Original Roof-January 2006 San Francisco-Golden Gate Railroad Museum
|
|
Original Floor-January 2006 San Francisco
|
Floor-Jan 2006 San Francisco
|
|
Roof Rebuild-September 2006 San Jose
|
Roof-Sept 2006 San Jose
|
Roof-September 2006 San Jose
|
Roof-Sept 2006 San Jose
|
Floor Rebuild-January 2008
|
Floor-January 2008
|
Floor-Jan 2008
|
Floor-Jan 2008
|
Metal Roof Install-May 2008
|
Metal Roof Install-May 2008
|
Metal Roof Install-May 2008
|
Cactus Garden from WP668 Roof
|
Metal Roof Install-May 2008
|
Metal Roof Done-May 2008
|
Subfloor Install-May 2008
|
Subfloor Install-May 2008
|
Subfloor Install
|
Subfloor Done
|
Images Copyright 2006-2008 by Katy Dickinson and John Plocher
