Avi Lenchner of Avi Decorative Painting
(Menlo Park, CA) has finished painting the inside of our backyard caboose, WP668.
All the little holes are filled. It looks bigger and brighter inside!
We took down the hanging bunk and its end wall in order to
fix the floor in January. Those have also been painted so they will
match. We will reinstall the bunk and wall after the new floor surface
goes in.
For earlier painting pictures, see my
March 31 blog.
Work in progress on WP668:
- Put up remaining ceiling trim and baseboards
- Install stained glass bay window
- Repaint original exterior markings (almost done)
- Paint 2nd ladder yellow (1st is done)
- Final electrical inspection and sign off
- Install stairway balusters and handrails (being made now)
- Final stairway inspection and sign off
- Install the metal roof covering
- Install roof walk
- Cover the floor with linoleum
- Install bookcases and bay window seat
- Reinstall bunk and end wall
Painting photos:
Primer coat done
|
Paint drying overnight
|
Final coat going on
|
Painting bunk boards
|
Final paint drying
|
WP668 yesterday
|
Images Copyright 2008 by Katy Dickinson and John Plocher